10 Considerations Before Scheduling Your Parking Lot For A Seal Coat

Like most business owners, you’re always looking for ways to save money and increase efficiency. One way to do both of those things is by seal coating your parking lot to prolong its life and save money on repairs. You’ll want to consider a few things before scheduling the job. DH Striping will discuss ten considerations that you should remember before organizing your parking lot for a seal coat. Keep these in mind, and you’ll be on your way to having a long-lasting and beautiful parking lot!

10 Considerations Before Sealcoating

By preparing for a successful project, you can save time and money in the long run!

1. Decide the Type of Coat

First, you’ll need to decide the type of coat you want to apply. There are three categories of seal coats: asphalt emulsions, coal tar pitch, and asphalt cements. Each type has its pros and cons, so do your research before deciding.

2. Check the Weather

Second, you’ll need to ensure the weather is suitable for seal coating. Applying a seal coat in cold or wet weather can compromise the quality of the finish. The coatings won’t adhere properly if it’s too cold or too hot outside. The ideal temperature range is between 50-90 degrees Fahrenheit.

3. Prepare the Surface

Third, you’ll need to ensure the surface is prepared correctly before applying the seal coat. It means cleaning off all of the dirt, debris, and oil spots from the surface. If this isn’t done correctly, the seal coat will eventually peel off.

4. Repair the Damages

Fourth, you may need to perform some repairs before applying the seal coat. It could include fixing any cracks or potholes on the surface. If these aren’t fixed, they’ll reappear after applying the seal coat.

5. Consult a Professional

Fifth, you should always consult a professional before scheduling your parking lot for a seal coat. They can help you select the correct type of coating and ensure that it’s applied correctly.

6. Time Required

Sixth, make sure you have enough time to complete the project. The entire process usually takes two to three days, depending on the size of the lot.

7. Prepare for Road Closures for Uninterrupted Work

Seventh, be prepared for some road closures while the project is underway.

8. Arrange Required Equipment and Gears

Eighth, make sure you have everything you need before starting the project. It includes ladders, shovels, rags, and safety gear.

9. Clean the Surface

Ninth, you’ll need to clean the surface of your parking lot. It includes removing all oil spots, grease spots, and other stains. Failure to do so can affect the quality of the finish.

10. Prepare for Safety

And lastly, tenth always is aware of your surroundings and take precautions while working on a seal coat project. Always wear gloves and goggles to save your hands and eyes from harmful chemicals.

Working on a seal coat project can be a lot of work, but it’s well worth it. By following these ten tips, you’ll ensure that your parking lot looks great and lasts for years. DH Striping are your parking lot maintenance experts, based in Lakeland, FL. We offer targeted services & maintenance plans for your lots.

Contact us today or book for a free estimate. Don’t hesitate, a perfect black top awaits you in sunny state!

Contact Us

Fill out the form below, and a team member will contact you shortly.

Name(Required)
This field is for validation purposes and should be left unchanged.